Interventions to improve the rainwater collection network at the service of the A32

null

Place
Oulx (TO)

Client
Sitaf SpA

Period
2020

Sites investigated
1,800 ml

Description:

The final-executive project located between the Blanc and Beaulard viaducts envisaged the definition of different types of works, such as consolidation of reinforced earth, hydraulic regulation, green areas and slope consolidation using naturalistic engineering techniques.

The latter involved the construction of multiple series of simple and double piling along a slope characterized by erosion of the surface layer of the ground. These are artifacts that act by gravity, made with eco-compatible inert materials such as wood, earth, rock, geotextiles.

BROWSE OTHER PROJECTS

Phytostatic stability analysis with VTA method and Poste Italiane Spa tree census

Green Management

Sustainable environmental restoration. Walking with the senses

Landscape design

Technical and economic feasibility project for the “AgriFood Project” – municipality of Tavagnasco (TO)

ESG sustainability
Menu