Executive planning of interventions in implementation of the Ordinary Maintenance Plan – PMO

null

Place
Pessinetto (TO), Traves (TO)

Client
Mountain Union of Municipalities of the Lanzo, Ceronda and Casternone Valleys

Period
2018

Description:

The definition of the interventions subject to final and executive planning was carried out on the basis of the comparison and indications of the municipal administrations and the Contracting Body . The analysis of the areas of interest was carried out through inspections, bibliographic searches and, where necessary, a detailed topographical survey. The objectives set by the interventions were the following:

  • restoring and maintaining the efficiency of the minor road system in relation to the water disposal network, in order to regulate its outflows and maintain the flow of surface water within the natural hydrographic network.
  • Mobilization of material in the riverbed and elimination of the instability phenomena in progress on the existing defense works by restoring adequate drainage sections and anti-erosive artifacts on the banks.
  • Reduction of the contributions to the sewerage of superficial corrosion waters through the maintenance and construction of drainage works leading to the natural drainage network (laying of wells, grids, drains and pipes).

BROWSE OTHER PROJECTS

Phytostatic stability analysis with VTA method and Poste Italiane Spa tree census

Green Management

Sustainable environmental restoration. Walking with the senses

Landscape design

Interventions to improve the rainwater collection network at the service of the A32

Environmental Design
Menu